Early access For dress and costume studios

Know what to sew first.
See what every rush costs.

prioritier keeps one deadline-ordered list of every dress in your studio, prints today's work on a single sheet for the floor, and shows you which orders will slip before you say yes to a rush.

You're on the list. We'll email you when early access opens.

$49/month per studio at launch. No payment now, and no spam.

Under 10 minutes of upkeep a day Paper on the floor, no worker logins A "what slips" preview for every rush
The prioritier board: dresses grouped by event, in priority order, each with a ship-by date, a projected finish, and an On track, Tight or Will miss flag.
The same board on an iPhone, with Rush and Add garment buttons at the bottom.
The problem

The plan lives in the boss's head.

Dresses are promised for competitions and studio visits. Then a rush comes in, the stones arrive late, a helper from another department joins for the afternoon, and the whole week reshuffles. Nobody can see what it cost until a dress misses its date.

Rushes arrive every day

Each yes quietly pushes other dresses back. By the time anyone notices, a competition dress is already late.

Materials show up late

Stones and fabric decide when work can start, not the calendar. Waiting dresses get forgotten until it's too late to catch up.

Schedulers need constant care

Earlier tools wanted accurate hour estimates for every person and daily updates. Nobody on a busy floor has time for that.

prioritier doesn't try to run your studio for you. It shows everyone the order of work, and shows the boss what each override costs.The idea behind it, in one sentence.

How it works

One sheet of paper a day.
That's the whole loop.

Your manager spends a few minutes on it. The floor never touches a screen.

1Morning

Print today's sheet

The top of the priority list, sized to your shop's hours, with a checkbox for every stage and a QR code.

2All day

The floor ticks boxes

Cut, Sew, Decorate, Finish, Shipped. If a dress is stuck, they write why. No logins, no phones, no training.

3Evening

Snap a photo

Upload it from your phone, even sideways or upside down. The QR code identifies the sheet and straightens the page.

4Done

Review and re-sort

The ticks are read for you and shown next to the photo. Accept them all or fix a row, and tomorrow's list is ready.

A printed daily sheet: three dresses in priority order with large checkboxes for Cut, Sew, Decorate, Finish and Shipped, a blocked line, a QR code, and Waiting on and At risk lists at the bottom.

The daily sheet: large black-and-white print, one landscape page, marked by hand.

Rush orders

Say yes with your eyes open.

Enter a rush before you promise it. prioritier re-sorts the list and shows where the new dress lands, which dresses slip past their ship-by date, and by how many days, all before you save.

  • Pin to the top when the boss insists. The override is recorded with what it displaced.
  • The override log totals the hours of work every rush and pin pushed back, so the cost is in front of whoever makes the promise.
New rush Camille Dubois · XL · regular order
The What slips preview: the rush lands at priority 7 and will miss by 2 days; 2 garments slip past ship-by, 56.3 hours of work pushed back; Zoe Martin slips 1 day and Priya Shah 2 days.
Every morning

Every dress, in the order it should be worked.

Dresses are sorted by ship-by date, the event deadline minus shipping days. Each one gets a projected finish from your shop's real capacity and is flagged on track, tight or will miss.

  • Home shows the day at a glance: capacity, what will miss, what's blocked, and what each team is working on.
  • The board groups dresses by event. Filter by team or phase and save the views you use every day.
  • Blocked dresses keep their place. They wait on a separate list with the latest day they can be unblocked and still ship on time.
The prioritier home screen: shop capacity 14 hours a day, 9 active garments, 3 will miss, 1 blocked, and today's priorities in order.
Timeline

See the next month before it happens.

The timeline lays out every dress phase by phase against its ship-by date. Lateness shows up as a red bar weeks ahead, while there's still time to do something about it.

  • Day, week and month zoom, with a line for today.
  • Per-team windows show when work reaches each team and how long it stays.
  • A tick for each ship-by date, so you can see how much room every dress has.
The timeline view: dresses down the side, bars across October showing projected work, green when on time, yellow when tight and red when past ship-by.
Built around four rules

Made for a busy floor, not a planning department.

0

Worker logins

Hourly staff work from paper. Only the manager uses the app.

<10 min

Of upkeep a day

Print in the morning, scan in the evening, and that's it.

0

Per-person estimates

Dress size and each team's daily hours are all it needs.

1

Page for the floor

One printed sheet is the whole worker interface.

Also included

Small details that come up every week.

Teams and hours

Give each team its hours per day and the phases it works. Hand-offs between teams are built into every projection.

Shipping built in

Overnight, express or ground, domestic or international. Transit days set each dress's real ship-by date.

Garment packages

Designs, fabric, measurements and client details print on a cover page, right after the daily sheet.

History and alterations

Every dress keeps a history. Reopen a finished one for alterations and see what it pushes back first.

Made for the manager's phone

Every screen works at iPhone size. Add a dress or a rush in under a minute, from anywhere in the studio.

Your data, exportable

Export every dress and the override log as CSV whenever you like. Each studio's data is kept separate.

prioritier on an iPhone: the Home screen with capacity, will miss and blocked counts, today's priorities, and Rush and Add garment buttons.
Pricing

One plan. One studio. Everything in it.

Less than the cost of one late competition dress.

Launch pricing

prioritier Studio

$49/ month per studio

Pricing may change before launch. Waitlist members hear first.

  • Unlimited dresses, events and teams
  • Priority board, timeline and saved views
  • Printable daily sheets with QR codes
  • Photo scan-back with a review screen
  • Rush "what slips" preview, pins and override log
  • Blocked list, garment packages and CSV export
Join the waitlist

No card needed. We'll email you when early access opens.

FAQ

Questions studios ask.

Do my workers need accounts or phones?

No. The floor works from the printed sheet: they tick a box when a stage is done and write a note if something is stuck. Only the manager uses the app.

Do I need to know exactly how long each dress takes?

No. You pick a size (S, M, L or XL), and each size is worth a set number of hours that you can adjust. You tell prioritier how many hours each team has per day. There are no per-person speeds and no time tracking.

What if the photo of the sheet is hard to read?

Glue and crystals smudge paper, so every reading goes through a review screen that shows each row next to the cropped photo. Marks the reader isn't sure about are held for you, and any row can be fixed with a tap before the board updates.

Can the boss still override the plan?

Yes. Pin a dress to the top and it moves first. Before you save, prioritier shows what the pin pushes back, and the override log keeps a record of it. It won't stop an override; it makes the cost visible.

What happens when stones or fabric are late?

Mark the dress blocked with a reason. It keeps its place in line, steps out of the schedule so it doesn't hold up others, and shows the latest day it can be unblocked and still ship on time.

Who is prioritier for?

Studios that make garments to hard deadlines: competition dresses, dance and skating costumes, and studio-visit orders. It suits a shop where one manager keeps the plan and a team of makers does the work.

How much will it cost?

$49 a month per studio at launch. That price may change before launch. Join the waitlist and you'll hear about early access and pricing first.

Stop guessing what slips.

Join the waitlist for early access to prioritier. We're opening it to a small number of studios first.

You're on the list. We'll email you when early access opens.

We'll only use your email to tell you about prioritier.